CART $0.00
646-423-4141

INSTALLATION IS SIMPLE

When working with the bell end of a large ductile pipe, the West Shore Night Cap goes on quickly and easily.
water main cap assembly

STEP-BY-STEP

Follow the instructions below for proper installation.

  1. Clean All Parts

    Make sure all parts are clean and free from debris or any object that could obstruct a tight seal.

  2. Install Gasket

    Choose the proper diameter gasket for the pipe, and insert gasket into the bell of the pipe.

  3. Install Plate

    Choose the proper diameter plate for the pipe, and insert plate into the bell of the pipe. We recommend installing blow off valve before installing plate.

  4. Install Clamps

    Distribute and position clamps evenly around the diameter of the pipe bell.

  5. Tighten Outside Bolts

    Tighten the short bolts on the outside of the clamps to 90 PSI. Tighten all bolts evenly around the bell.

  6. Tighten Top Bolts

    Tighten the long bolts on top of the clamps down onto the plate. Tighten all bolts evenly around the plate.

Water Main Cap

THIS TOOL IS INSTALLED AT THE FULL RESPONSIBILITY OF THE CONTRACTOR

image-2

WE’RE SERIOUS ABOUT SAFETY

With our system, water can be restored in as little as 3 minutes, which is critical in situations of fire, explosion, natural disaster, acts of terrorism, and more. We get the water running ASAP!


VIEW THE BENEFITS »

We encourage ALL contractors to use this product. In fact, we’d love to see this put into NYC’s standards.

- NYC CONSTRUCTION OFFICIAL
FIND A VENDOR »
WEST SHORE INDUSTRIES
56 Taylors Mills Rd.
Manalapan, NJ 07726
646-423-4141